Tuesday, July 15, 2014

Slow and Steady

Blueboard complete, plaster is next….

Sunday, May 18



The blueboard of the kitchen and addition is nearly complete so the prep begins for the plasterers.
Alex had a little fun trying on the stilts the plasterers wear to reach the ceilings and corners of the room.

In the new kitchen….

In the hallway from the new kitchen leading to the den…

Below are some great angles without Alex on stilts.
Standing in the new eating area looking toward the den. 


Here are two angles of the new staircase.  On the left looking up the stairs, on the right looking toward the new first floor 1/2 bathroom.

Above is a nice view toward the front of the kitchen.
Below toward the back of the kitchen and the porch.






Here are two views from the top of the stairs looking down, and looking at the entrance to the future master bedroom. (which for the short term will be carpeted and will become the rec room/ guest room).

Above is a view of the "rec room" in progress.

Thursday, May 29, 2014

Blueboard has begun!

Monday, May 12


Prior to the blue board being installed on the walls the plumber was busy laying floor and tubing in the future master bathroom in preparation for radiant floor heat!
The same kind of prep will be done in the kitchen as well.

It looks like a puzzle before they lay the floor.



Here are two views of the future master bedroom (aka boys hang out room for the next few years) with the blue board in the installation process…..




Thursday, May 22, 2014

Skylights on the porch

Sunday, May 11

Today was a beautiful day to cut the skylights into the porch roof.  The insulation is complete and there will be three skylights- two fixed and one that can be opened.



Halsey is up on the roof!





Here are a couple of great views of the North side of the house. The brick steps are complete, and the siding needs to be completed.

Insulation and drywall delivery...

Thursday, May 8


The space continues to change as the insulation has been sprayed onto the walls.

Halsey is standing in the new kitchen.  The space feels more and more like a room now that the walls are filled in.


Once again a large (actually huge) truck has maneuvered into our driveway to deliver blue board that will be screwed onto the walls…. and then the walls will be plastered…
and painted! 




This truck has an amazing "arm" that lifted the drywall through the 2nd floor window to the upstairs space.  It saves a lot of hauling up and down stairs.  




Delivery complete, the kitchen is ready for blue board!!!


Little things can make a big difference...

Saturday, April 26

This week the last of the windows were put into place in the downstairs hallway which makes a huge difference in the natural light that comes into the hall.

The lighting is evident from the top of the new stairway.


Walk down the stairs and turn on the landing and view the light pouring in from a window that was placed at the end of the downstairs hall.  This space will be an awesome nook in the future!


The view below is taken while standing on the mat placed in front of the doorway shown above.  
There is so much natural light! 


Below is another view of the hallway looking from the new kitchen toward the door with the welcome mat.
The first doorway opening is for a new closet, 
the second doorway opening is for the future re-incarnation of Fenway (aka 1/2 bathroom).



National Grid returns…..

Saturday, April 19


Fast forwarding now to some closure on the work that was done in February.  National Grid returned to complete the gas hook up from the street to the house.

This time we had a bit more notice, but they always bring a huge entourage!



Thursday, May 1, 2014

Odds and Ends continued…..

Sunday, March 22
Odd jobs continue….

The interior framing and prep for blue board takes a steady constitution and attention to detail.  The plumber has been into the space to begin the rough plumbing, and the electrician has made a visit or two.  
Above is a great view from the TV room on the first floor looking at the base of the stairs,
and 
Below the focus is down the future hallway to the kitchen.
Note there is now a wall on the left where the old stairs used to be!


Here is the same view from the future kitchen looking 
into the TV room.

Upstairs a temporary railing has been put 
into place for safety.



The above view is looking off to the left at the top of the stairs, and the below view looking at the top of the stairs.

Now the snow has finally melted and the back 
of the house is coming together.
Siding work continues in preparation for the last bit 
of roof work.