Week of August 25-29
Mudroom tile installation...
This week the mudroom came closer to completion as the exterior door was installed and then the tile.
Here are photos of the door to the garage both open and closed. The floor will be radiant heat. If you look closely you can see the tubes running back and forth.
Gordon is leaving through the garage and you can see the three closet doors in the mudroom.
Below is the view from the door to the garage looking back at Halsey's closet with double doors.
We were lucky to have a talented craftsman, Rich from M&M tile laying the tile in the mudroom. We chose a 12x24 tile and it was laid in a running bond style. Rich did a beautiful job.
Here is the layout.
Above- Rich cementing the tiles in place.
And the finished product with the tiles and the grout.
It is a very calm and peaceful look.
The paint still needs to go on the wall as well as some finishing touches however this mudroom will be in use
very soon!
No comments:
Post a Comment